Farm solar planning exemptions and Solar Safeguarding Zones

Under S.I. No. 493 of 2022, solar panels can cover an entire agricultural shed roof without planning permission outside Ireland's 43 Solar Safeguarding Zones. Inside an airport or helipad SSZ, exempt roof area caps at 300 m² with 4-week council notice; ground-mounted farm solar caps at 75 m².

S.I. No. 493 of 2022 rules for agricultural shed roofs, the 300 m² Solar Safeguarding Zone cap near airports, and the 75 m² limit on ground arrays.

Free, no obligation. One local installer prices it, not five.

  • Full roofexempt on sheds outside SSZs
  • 300 m²exempt shed cap inside 43 SSZs
  • 75 m² / 2.5 mexempt ground-mount cap & height
  • 4 weeksSSZ written council notice rule
Green grass field looking towards a long farm shed roof fitted with solar panels under cloudy skies

How S.I. No. 493 of 2022 removed the old 50 m² farm cap

Prior to October 2022, Irish agricultural buildings were restricted to a tight 50 m² solar exemption (barely 10 kWp), forcing dairy and poultry farms into full planning applications. S.I. No. 493 of 2022 alongside S.I. No. 492 of 2022 scrapped that cap for agricultural rooftops outside Solar Safeguarding Zones, allowing full-roof arrays provided the electricity is generated primarily for on-site agricultural consumption rather than pure merchant grid export.

One critical check catches farms near Dublin, Cork, Shannon, Knock, Kerry, Waterford, Donegal, Weston, Baldonnel, Abbeyshrule and major hospital helipads: check whether your yard sits inside one of the 43 mapped Solar Safeguarding Zones (created to prevent aviation glint and glare). Even inside an SSZ, 300 m² of roof aperture still fits roughly 55 to 60 kWp of modern panels without planning permission, provided you send written notice to your county council within 4 weeks of commencing installation.

Agricultural roof outside SSZs

Statutory exemption limit
No area cap (full shed roof)
Extra conditions under S.I. 493/2022
Power primarily for on-site farm use; panels must not project above ridge height.

Agricultural roof inside an SSZ

Statutory exemption limit
Up to 300 m² aperture area
Extra conditions under S.I. 493/2022
43 zones around Irish airports, aerodromes and helipads; notify local council in writing within 4 weeks of starting.

Ground-mounted (free-standing)

Statutory exemption limit
Up to 75 m² aperture area
Extra conditions under S.I. 493/2022
Max 2.5 m height above ground; must sit behind the front wall of the nearest agricultural building to a public road.

Wall-mounted on farm shed

Statutory exemption limit
Up to 75 m² aperture area
Extra conditions under S.I. 493/2022
Must sit within 15 cm of wall plane and at least 50 cm inside wall edges.

Protected Structure or ACA

Statutory exemption limit
Exemption disapplied
Extra conditions under S.I. 493/2022
Full planning permission needed where panels would materially affect heritage character.

Price my farm solar

Four quick taps show your full ex-VAT cost and net cost after the 60% TAMS 3 grant before we ask for a phone number.

Tillage or grain store solar PV, 30 kWp array, with TAMS 3 60% grant: €11,200 to €15,600 net after 60% TAMS (full €28,000 to €39,000 ex-VAT).

Step 1 of 5

What type of farm is it?

Pick the closest. The installer reviews your annual bills on site.

How the farm solar figure is worked out

Guide ranges reflect typical Irish ex-VAT supply-and-fit agricultural PV rates (€1,000 to €1,400/kWp on sound steel shed roofs; €1,300 to €1,850/kWp ground-mounted) for panels, mounting rails, inverters, DC/AC cabling and DAFM S.198 commissioning. Net figures deduct the 60% TAMS 3 SCIS grant (paid on the lowest of actual ex-VAT invoice, proposed cost or DAFM reference cost up to €90,000). Optional battery storage (grant-aided up to 50% of solar kWp), ESB NC7 fee (€1,041.81 incl. VAT), purlin strengthening or asbestos roof replacement are priced after an on-farm survey. farmsolarpanels.ie is not DAFM, SEAI or a government body and does not award grants.

When to request a Section 5 declaration from your council

If your yard sits right on an SSZ boundary, beside a Protected Structure stone barn, or combines an older shed with a partial ground frame, apply for a Section 5 declaration from your local county council planning office (€80 statutory fee, 4-week decision period). Written confirmation from the council protects your DAFM TAMS 3 payment claim if an inspector ever queries planning exemption status. See also ground-mounted farm solar rules and TAMS 3 survey checks.

Farm solar planning and SSZ questions

How much kWp fits inside the 300 m² Solar Safeguarding Zone rooftop limit?

Modern commercial solar panels deliver roughly 210 to 220 W per square metre, so 300 m² of panel aperture area covers roughly 60 to 62 kWp, right up to the full TAMS 3 SCIS maximum without needing planning permission, subject to 4-week council notice.

What if I want a 30 kWp ground-mounted solar array on my farm?

A 30 kWp ground-mounted array needs roughly 140 to 150 m² of aperture area, which exceeds the 75 m² free-standing exemption. You must obtain full planning permission before applying under TAMS 3.

How do I check if my farm is inside a Solar Safeguarding Zone?

Your solar installer checks your Eircode against the Department of Housing SSZ GIS map during the pre-application solar survey, before lodging TAMS paperwork.

Does a farm solar exemption allow panels to stick up above a flat or pitched shed ridge?

No. On pitched roofs, panels must not protrude above the highest point of the existing roof (excluding chimneys), and edge clearances must be maintained under the regulations.

All farm solar pages and guides

Green grass field looking towards a long farm shed roof fitted with solar panels under cloudy skies

Check SSZ mapping and shed sizing for your farm

Choose your county in the planner and a single farm solar installer in your county will check your Eircode against SSZ maps on survey.