TAMS 3 solar survey and S.198 rules
Before applying for TAMS 3 SCIS on agfood.ie, DAFM requires a completed Solar PV Survey tying your proposed kWp to verified farm electricity use. Never order equipment before written approval arrives. farmsolarpanels.ie is not DAFM, SEAI or a government body and does not award grants.
What the mandatory pre-application survey measures, how DAFM scores tranches on agfood.ie, and what S.198 sign-off requires.
Free, no obligation. One local installer prices it, not five.
- S.198DAFM minimum technical specification
- 12 monthsfarm MPRN bills reviewed for sizing
- 5 ha minBISS area or production unit floor
- Zero early startsbuy nothing before written approval

What the mandatory DAFM Solar PV Survey checks
You cannot pick a random 40 kWp array off a brochure and lodge it for the 60% TAMS 3 grant. DAFM uses the Solar PV Survey to confirm that your proposed array matches real agricultural consumption rather than building a commercial solar farm on public grant money. The surveyor inspects your last 12 months of farm MPRN bills (stripping out domestic farmhouse consumption where meters are shared), measures roof orientation and shading, checks whether the shed roof can carry the array, and sets the eligible kWp ceiling and matching 50%-capped battery kWh.
12-month farm MPRN bills
- Who prepares it
- Farmer (from electricity supplier)
- Why DAFM requires it
- Proves genuine agricultural annual kWh demand (house usage excluded) to justify target kWp.
DAFM Solar PV Survey
- Who prepares it
- Qualified solar surveyor or advisor
- Why DAFM requires it
- Calculates expected annual yield, confirms shading, roof pitch and 50% battery cap before application.
agfood.ie TAMS 3 submission
- Who prepares it
- Farmer or agricultural advisor
- Why DAFM requires it
- Logs proposed system kWp, battery kWh and reference-cost valuation before tranche closing date.
DAFM S.198 installation cert
- Who prepares it
- Safe Electric REC (PV trained)
- Why DAFM requires it
- Certifies panels, isolators, surge protection, labels and schematics for final 60% payment claim.
Price my farm solar
Four quick taps show your full ex-VAT cost and net cost after the 60% TAMS 3 grant before we ask for a phone number.
Dairy farm solar PV, 30 kWp array, with TAMS 3 60% grant: €11,200 to €15,600 net after 60% TAMS (full €28,000 to €39,000 ex-VAT).
How the farm solar figure is worked out
Guide ranges reflect typical Irish ex-VAT supply-and-fit agricultural PV rates (€1,000 to €1,400/kWp on sound steel shed roofs; €1,300 to €1,850/kWp ground-mounted) for panels, mounting rails, inverters, DC/AC cabling and DAFM S.198 commissioning. Net figures deduct the 60% TAMS 3 SCIS grant (paid on the lowest of actual ex-VAT invoice, proposed cost or DAFM reference cost up to €90,000). Optional battery storage (grant-aided up to 50% of solar kWp), ESB NC7 fee (€1,041.81 incl. VAT), purlin strengthening or asbestos roof replacement are priced after an on-farm survey. farmsolarpanels.ie is not DAFM, SEAI or a government body and does not award grants.
DAFM S.198 technical standard and payment claim traps
Once written approval lands on agfood.ie, the installation itself must satisfy DAFM Minimum Specification S.198. Cutting corners here delays or blocks your 60% payout during inspection.
- Safe Electric Registered Electrical Contractor (REC) with PV training. The installer signing off must hold QQI Level 6 (or equivalent recognised microgeneration certification) alongside active Safe Electric registration.
- SEAI Triple E listed components. Choosing panels and inverters listed on the SEAI Triple E register qualifies the system for both 100% Year 1 Accelerated Capital Allowances and Form VAT 58 recovery.
- Complete paid-invoice trail. DAFM requires bank statements showing full electronic payment to the installer, serial numbers, Safe Electric Completion Certificate, ESB NC6 or NC7 confirmation and the signed S.198 declaration.
- Respect the completion deadline. Check the exact expiry date on your DAFM approval letter; extensions are tightly controlled and late claims risk losing grant aid.
Read TAMS 3 60% grant ceilings and the full timeline from survey to payout.
Related farm solar guides
TAMS 3 60% solar grant€90,000 ring-fenced ceiling, DAFM reference costs and 62 kWp cap.
Installation timelineWeeks from survey and TAMS tranche through ESB offer to commissioning.
Shed purlins & asbestosPurlin load checks, engineer sign-off and HSA fibre-cement bans.
ESB NC6 vs NC7 grid rules6/11 kVA inform-and-fit vs 50 kVA Connection Offers and €1,041.81 fee.
Comparing farm quotesTen technical lines every written agricultural solar quote should state.
Farm solar cost by kWpFull 10–50 kWp ex-VAT prices before and after the 60% TAMS 3 grant.TAMS 3 survey and S.198 questions
How much does a TAMS 3 Solar PV Survey cost?
Standalone farm solar surveys typically cost €250 to €550, though many Irish agricultural solar installers credit the survey fee back off the final invoice if they complete the build.
Can my Teagasc or private agricultural advisor submit the agfood.ie application?
Yes. Most farmers have their Teagasc or ACA agricultural advisor upload the completed Solar PV Survey, farmyard map and application details before the tranche deadline.
What if my milking parlour and farmhouse share one electricity meter?
Your surveyor separates farm demand using Teagasc herd benchmarks or sub-meter readings so the TAMS 3 application covers agricultural load only, while domestic household power is excluded.
Does farmsolarpanels.ie carry out DAFM inspections or approve grants?
No. farmsolarpanels.ie is not DAFM, SEAI or a government body and does not award grants. We pass your outline to a single farm solar installer in your county to prepare your survey and written quote.
All farm solar pages and guides
Farm PV systems
Grants, grid & tax

Book an on-farm TAMS 3 solar survey
Enter your farm type and county in the planner so a single farm solar installer in your county can review your bills and sheds.
