Shed roof purlins, structural checks and asbestos warning
Adding solar PV puts 15 to 20 kg/m² of extra dead load plus Atlantic wind-uplift forces onto shed purlins and rafters. Modern steel-framed roofs handle it cleanly; older light timber purlins need a chartered engineer's check, and pre-2000 corrugated asbestos fibre-cement sheets must never be drilled or mounted on.
What 15 to 20 kg/m² of solar panels adds to an Irish farm shed, when you need a structural engineer, and why asbestos fibre-cement roofs are strictly off limits.
Free, no obligation. One local installer prices it, not five.
- 15–20 kg/m²typical PV panel + rail dead weight
- Pre-2000fibre-cement roofs assumed asbestos
- €350–€850chartered engineer roof load check
- Zero drillingHSA rule on asbestos cement sheets

Checking purlins, rafters and Atlantic wind uplift
A 30 kWp array weighs roughly 1.6 to 2.2 tonnes spread across 150 m² of shed roof, and in coastal or upland counties like Kerry, Clare, Mayo, Galway or Donegal, winter storm suction tries to lift panels upward off the purlins with even greater force. Under DAFM S.101 and S.198 principles, existing agricultural sheds must be structurally capable of carrying the combined dead load, snow load and wind uplift before a rail is bolted down.
Modern TAMS-built portal-frame sheds with galvanised steel C- or Z-purlins at 1.4 m to 1.8 m centres almost always pass structural checks easily. Where a shed is 30+ years old with 4x2 timber purlins, corroded eaves brackets or visible roof sag, spend €350 to €850 on a chartered structural engineer's inspection up front rather than risking a storm failure or a refused DAFM sign-off.
Modern steel box-profile on steel Z-purlins
- Solar suitability
- Ideal (fastest mount)
- Action required before fitting
- Verify cladding thickness (0.5–0.7 mm), purlin spacing and wind-zone rail fixings.
Insulated PIR composite roof panels
- Solar suitability
- Suitable with correct kit
- Action required before fitting
- Use manufacturer-approved mini-rails or through-fix purlin hangers with EPDM weather seals.
Older steel cladding on timber purlins
- Solar suitability
- Check structure first
- Action required before fitting
- Inspect for damp rot around ridge vents; get a chartered engineer sign-off where purlins are light or sagging.
Corrugated asbestos fibre-cement (pre-2000)
- Solar suitability
- Prohibited: DO NOT MOUNT
- Action required before fitting
- Fragile and hazardous under HSA law; licensed removal and steel reroof first (or fit a ground array).
Non-asbestos modern fibre-cement (post-2000)
- Solar suitability
- Specialist hanger bolts only
- Action required before fitting
- Requires purlin-mounted stainless hanger bolts, crawling boards and engineer load verification.
Price my farm solar
Four quick taps show your full ex-VAT cost and net cost after the 60% TAMS 3 grant before we ask for a phone number.
Beef or suckler shed solar PV, 20 kWp array, with TAMS 3 60% grant: €8,000 to €10,400 net after 60% TAMS (full €20,000 to €26,000 ex-VAT).
How the farm solar figure is worked out
Guide ranges reflect typical Irish ex-VAT supply-and-fit agricultural PV rates (€1,000 to €1,400/kWp on sound steel shed roofs; €1,300 to €1,850/kWp ground-mounted) for panels, mounting rails, inverters, DC/AC cabling and DAFM S.198 commissioning. Net figures deduct the 60% TAMS 3 SCIS grant (paid on the lowest of actual ex-VAT invoice, proposed cost or DAFM reference cost up to €90,000). Optional battery storage (grant-aided up to 50% of solar kWp), ESB NC7 fee (€1,041.81 incl. VAT), purlin strengthening or asbestos roof replacement are priced after an on-farm survey. farmsolarpanels.ie is not DAFM, SEAI or a government body and does not award grants.
The pre-2000 asbestos fibre-cement warning (HSA rules)
Thousands of older Irish haysheds, parlours and cattle houses built before 2000 carry grey corrugated asbestos fibre-cement sheeting. Under the Health and Safety Authority (HSA) Code of Practice for Safety in Roofwork and the Exposure to Asbestos Regulations, two strict rules apply:
- Inherently fragile surface. Weathered fibre-cement sheets shatter without warning under foot load. Walking directly on them is a major cause of fatal farm falls in Ireland.
- Never drill, cut or bolt rails into asbestos cement. Drilling releases Category 1 carcinogenic asbestos fibres into the yard and animal housing.
- Reroof first or go ground-mounted. While DAFM does not grant-aid hazardous asbestos disposal itself, farmers frequently use TAMS 3 roof and purlin replacement measures to upgrade to modern steel sheeting before fitting solar PV, or bypass the old shed entirely with a ground-mounted array.
Comparing reroofing against a field frame? Read ground-mounted farm solar.
Related farm solar guides
Ground-mounted farm solarDriven-pile arrays for shaded yards or older asbestos sheds.
TAMS 3 survey & S.198Mandatory pre-application solar survey, S.198 spec and agfood steps.
Dairy farm solarMilking parlour cooling, water heating and 20–50 kWp sizing.
Beef and drystock sheds10–20 kWp slatted shed arrays, yard loads and summer export.
Tillage and grain storesWide-span grain store roofs, harvest fans and workshop power.
Comparing farm quotesTen technical lines every written agricultural solar quote should state.Farm shed roof and asbestos questions
How can I tell if my older corrugated fibre-cement shed roof contains asbestos?
Any corrugated fibre-cement sheeting installed in Ireland prior to 2000 must be presumed to contain asbestos unless laboratory bulk-sample testing by a competent surveyor proves it is non-asbestos PVA fibre-cement.
Can I clamp solar panels onto corrugated box-profile steel without piercing the roof?
Standing-seam steel roofs take zero-penetration seam clamps. Standard trapezoidal box-profile steel sheets use short EPDM-sealed crest fixings or structural purlin screws designed specifically to stay watertight over 25 years.
Will clear roof skylight panels get in the way of solar panels?
Yes. Installers map every translucent polycarbonate or fibreglass roof light during the survey, keeping panels and walkway boards strictly off skylights and leaving daytime natural light inside animal housing.
Does my farm insurance need to know about rooftop solar panels?
Yes. Notify your farm insurer in writing with your Safe Electric Completion Certificate and structural sign-off so the panels and shed remain covered for storm and fire.
All farm solar pages and guides
Farm PV systems
Grants, grid & tax

Have a local installer inspect your shed roofs
Tell us your farm type and rough size in the planner, and a single farm solar installer in your county will check purlins and cladding on site.
