Farm solar panels in Clare
Agricultural solar PV in Clare runs €1,000 to €1,400/kWp ex-VAT on a sound steel shed roof. With the 60% TAMS 3 grant applied, a typical 10 kWp system drops from €10,000 to €13,500 gross to €4,000 to €5,400 net ex-VAT.
What dairy, cattle, tillage and poultry yards in Clare pay per kWp before and after the 60% TAMS 3 solar grant.
Free, no obligation. One local installer prices it, not five.
- €4,000–€5,40010 kWp beef shed array net after 60% TAMS
- 60% to €90kTAMS 3 SCIS ceiling (max €54k)
- 6,297farms in Clare, Census of Agriculture 2020
- 49%of county homes outside census towns

Farm electricity loads and shed solar demand in Clare
Clare has 6,297 farm holdings averaging 32.1 hectares (Census of Agriculture 2020), while Census 2022 recorded 46,441 occupied dwellings with 49% outside the towns. Specialist beef and suckler holdings dominate here, with 70,856 suckler cows inside a county herd of 296,194 cattle alongside 583 dairy herds (averaging 59.9 cows) and 41,810 sheep. Because TAMS 3 sizes arrays against farm electricity bills rather than farmhouse usage, drystock yards usually fit 10 to 20 kWp while local dairy parlours target 20 to 30 kWp.
West Clare holdings around Kilrush and Ennistymon face direct Atlantic fetch, where extra rail clamps and stainless hardware matter more than squeezing an extra degree of tilt. Further east near Ennis and Sixmilebridge, sheltered drystock and dairy yards sit close to stronger ESB feeders.
Ennis
- Census 2022 homes
- 10,587
- Heating profile
- 54% oil / 11% elec
- Farm solar context
- Good access for telehandler roof work across nearby farms, with ESB feeder checks on longer rural spurs.
Shannon
- Census 2022 homes
- 3,877
- Heating profile
- 52% oil / 10% elec
- Farm solar context
- Commercial sheds around this catchment suit neat 10 to 30 kWp arrays wired back to the main yard fuseboard.
Kilrush
- Census 2022 homes
- 1,076
- Heating profile
- 45% oil / 14% elec
- Farm solar context
- Market town serving mixed cattle, dairy and arable yards; array size depends on 12 months of farm MPRN bills.
Sixmilebridge
- Census 2022 homes
- 974
- Heating profile
- 27% oil / 5% elec
- Farm solar context
- Local yards combine older haysheds and newer portal frames; purlin checks pick the strongest roof slope first.
Newmarket-on-Fergus
- Census 2022 homes
- 738
- Heating profile
- 61% oil / 16% elec
- Farm solar context
- Open agricultural hinterland where clean south or east-west steel roofs handle 10 to 30 kWp without shading.
Price my farm solar
Four quick taps show your full ex-VAT cost and net cost after the 60% TAMS 3 grant before we ask for a phone number.
Beef or suckler shed solar PV, 10 kWp array, with TAMS 3 60% grant, in Clare: €4,000 to €5,400 net after 60% TAMS (full €10,000 to €13,500 ex-VAT).
How the farm solar figure is worked out
Guide ranges reflect typical Irish ex-VAT supply-and-fit agricultural PV rates (€1,000 to €1,400/kWp on sound steel shed roofs; €1,300 to €1,850/kWp ground-mounted) for panels, mounting rails, inverters, DC/AC cabling and DAFM S.198 commissioning. Net figures deduct the 60% TAMS 3 SCIS grant (paid on the lowest of actual ex-VAT invoice, proposed cost or DAFM reference cost up to €90,000). Optional battery storage (grant-aided up to 50% of solar kWp), ESB NC7 fee (€1,041.81 incl. VAT), purlin strengthening or asbestos roof replacement are priced after an on-farm survey. farmsolarpanels.ie is not DAFM, SEAI or a government body and does not award grants.
Roof mounting, wind uplift and yard siting in Clare
A solar quote in Clare starts on the shed roof, not in a brochure. Roof pitch, compass aspect, purlin spacing and local wind or salt exposure set both the mounting hardware and how much of the array's output lands during milking or yard work.
Atlantic wind uplift & salt
Extra edge clamps & stainless fixings
On Atlantic-facing farmyards, mounting rails are engineered for uplift rather than just panel weight. Edge rows get extra purlin brackets, galvanised or aluminium rails and marine-grade fixings.
Pre-2000 asbestos roof rule
Reroof €45 to €85/m² or ground-mount
Corrugated fibre-cement sheets laid before 2000 often contain asbestos and are fragile underfoot. HSA rules ban drilling or walking on them, so the choice is licensed replacement first or a ground-mounted array.
Ground-mount on thin limestone
Concrete ballast or drilled rock anchors
Thin soil over limestone rock favours using a sound steel shed roof wherever one exists. Where a ground frame is unavoidable, budget for pre-drilling piles or pouring concrete strip bases.
Inspect fixing options in corrugated roof solar mounting alongside purlin load and asbestos safety before agreeing a final shed slope.
Farm solar panel costs and ESB grid rules in Clare
10 kWp slatted beef shed NC6 array near Ennis
€4,000 to €5,400 net
22 to 25 panels across ~50 m² of sound metal roof. Full price €10,000 to €13,500 ex-VAT before 60% TAMS 3; generates 8,500 to 9,500 kWh/yr. Max TAMS battery: 5 kWh.
20 kWp cattle & dairy roof + 10 kWh battery near Shannon
€9,600 to €12,800 net
20 kWp roof array (44 to 50 panels, ~100 m²) plus 10 kWh battery: €24,000 to €32,000 gross ex-VAT before 60% TAMS 3. Yields 17,000 to 19,000 kWh/yr.
10 kWp ground-mounted paddock array near Kilrush
€5,200 to €7,000 net
Piled paddock frame for yards with older roofs: €13,000 to €17,500 full ex-VAT, €5,200 to €7,000 net under TAMS 3 SCIS, generating 8,500 to 9,500 kWh/yr.
National ex-VAT rates apply across Clare. Ask your installer to separate marine-grade rail hardware, trenching (€600 to €2,200), engineer roof sign-off (€350 to €850) and ESB paperwork so quotes compare cleanly.
Your AC inverter limit sets the ESB Networks paperwork. Single-phase yards up to 6 kVA and three-phase sheds up to 11 kVA notify free under NC6 (20 working days to IS EN 50549-1). Above those thresholds, up to 50 kVA three-phase, an NC7 application costs €1,041.81 incl. VAT and takes 8 to 16 weeks before installation begins, after which smart-metered export draws 14c to 19.5c/kWh via CEG.
Remember VAT and tax write-offs when setting cash flow: Revenue reserves 0% VAT strictly for private dwellings, not farm sheds. VAT-registered farmers claim shed PV VAT back on VAT 3 returns, while flat-rate unregistered farmers reclaim it on Form VAT 58 within 4 years (claims over €125) provided the equipment sits on the SEAI Triple E register. Triple E kit also qualifies for a 100% Year 1 Accelerated Capital Allowance on the net ex-VAT spend instead of 8-year wear and tear. See full farm solar costs, ESB NC6 vs NC7 and ACA and Form VAT 58.
Planning exemptions and TAMS 3 solar rules in Clare
Local planning determinations for Clare farmyards are handled by Clare County Council at Ennis.
One national exemption governs farm roofs: S.I. No. 493 of 2022 allows unlimited rooftop solar on agricultural sheds outside the 43 airport and helipad Solar Safeguarding Zones, caps exempt roof area at 300 m² inside an SSZ (with 4-week written notice), and exempts ground-mounted farm PV up to 75 m² at 2.5 m maximum height. Full details are on planning and SSZ zones.
- No early start under TAMS 3 SCIS. SCIS pays 60% up to a ring-fenced €90,000 ceiling (€54,000 max grant, 62 kWp cap, battery up to 50% of kWp) to active herd, flock or crop numbers with at least 5 hectares. Ordering panels or fitting rails before formal written approval lands on agfood.ie voids the grant.
- Solar Safeguarding Zones (S.I. No. 492 of 2022). Verify your yard Eircode against Clare County Council's SSZ mapping early. Outside an SSZ a full shed roof is exempt; inside one, rooftop panels cap at 300 m² without permission and require 4 weeks' written notice.
- Alternative route for non-TAMS yards. Where a commercial equestrian yard, packhouse or large poultry unit falls outside TAMS 3 eligibility or above 62 kWp, check the SEAI Non-Domestic Microgen Grant (up to 45% on systems up to 1,000 kWp on seai.ie); the two grants cannot be stacked on the same system.
Paperwork drives the calendar: 3 to 6 months for DAFM approval on agfood.ie versus 2 to 5 days on the shed roof once cleared. farmsolarpanels.ie is not DAFM, SEAI or a government body and does not award grants. Next: TAMS 3 SCIS and S.198 survey checks.
Yard access, towns covered and counties beside Clare
Installers serving Clare cover yards along the M18 and down rural boreens alike. On survey day they check safe lift standing beside the chosen shed, clean plant-room space for the inverter and battery, and the shortest cable route to the main farm fuseboard.
Coverage runs across Ennis, Shannon, Kilrush, Sixmilebridge, Newmarket-on-Fergus, Killaloe, Kilkee and the surrounding rural townlands. Sending your yard outline passes it to one commercial and agricultural solar installer covering Clare, never a multi-company call list.
- Farm solar panels in Galway. East Galway slatted beef roofs and Connemara coastal NC6 setups.
- Farm solar panels in Limerick. Golden Vale dairy cooling peaks and west Limerick upland roofs.
- Farm solar panels in Tipperary. Golden Vale dairy parlours, stud farms and wide cubicle roofs.
Useful next reads: how to compare farm solar quotes and equestrian and mixed farm PV. Every county guide is listed on our counties page.
Leinster: Carlow · Dublin · Kildare · Kilkenny · Laois · Longford · Louth · Meath · Offaly · Westmeath · Wexford · Wicklow
Munster: Cork · Kerry · Limerick · Tipperary · Waterford
Connacht: Galway · Leitrim · Mayo · Roscommon · Sligo
Ulster: Cavan · Donegal · Monaghan
Before you book a Clare solar survey
How much is a shed-roof solar array in Clare?
Sound steel roof arrays in Clare run €1,000 to €1,400/kWp ex-VAT gross. Deducting the 60% SCIS grant brings a 10 kWp system to €4,000 to €5,400 net, with VAT recovered through VAT 3 or Form VAT 58.
How do Solar Safeguarding Zones affect Clare farms?
Check Clare County Council SSZ maps first: outside a safeguarding zone, S.I. No. 493 of 2022 exempts the full shed roof without an application. Inside an SSZ, notify the council 4 weeks ahead up to 300 m², or lodge a €80 Section 5 check if unsure.
Is 10 kWp enough for a drystock yard in Clare?
Unless you run a milking parlour or heavy workshop plant, 10 kWp (€4,000 to €5,400 net after TAMS 3) is the practical starting point for a Clare beef shed, avoiding NC7 fees while earning 14c to 19.5c/kWh on summer export.
What inverter size triggers an ESB NC7 application in Clare?
Small 10 kWp drystock arrays usually stay inside free NC6 micro-generation. Most 20 to 50 kWp dairy, poultry or grain store arrays in Clare run on three-phase power under ESB NC7 (€1,041.81 incl. VAT, 8 to 16 weeks for the offer).
Which parts of Clare do agricultural solar installers cover?
Installers cover yards across Ennis, Shannon, Kilrush, Sixmilebridge, Newmarket-on-Fergus, Killaloe and every rural townland in Clare. Your outline goes to one local agricultural solar installer who phones you to arrange an on-farm survey.
All farm solar pages and guides
Farm PV systems
Grants, grid & tax

Price solar PV for your milking parlour
Select your kWp band and county to see net TAMS costs, then a single farm solar installer in your county reviews your parlour MPRN bills.