Farm solar panels in Offaly
Agricultural solar PV in Offaly runs €1,000 to €1,400/kWp ex-VAT on a sound steel shed roof. With the 60% TAMS 3 grant applied, a typical 20 kWp system drops from €20,000 to €26,000 gross to €8,000 to €10,400 net ex-VAT.
Sizing farm solar PV across Tullamore, Edenderry, Birr and rural Offaly: shed roof checks, TAMS 3 SCIS ceilings, ESB NC6/NC7 rules and worked kWp prices.
Free, no obligation. One local installer prices it, not five.
- €8,000–€10,40020 kWp farm roof array net after 60% TAMS
- 60% to €90kTAMS 3 SCIS ceiling (max €54k)
- 3,300farms in Offaly, Census of Agriculture 2020
- 48%of county homes outside census towns

Dairy, drystock and yard solar demand across Offaly
CSO Census of Agriculture 2020 counted 3,300 farms across Offaly averaging 37.6 hectares, alongside 28,702 occupied homes in Census 2022 (48% outside census towns). Offaly holds 254,688 cattle including 35,738 dairy cows (averaging 91.2 cows across 392 herds) plus 8,692 hectares of cereals and 103,701 sheep. Open midland yards around Tullamore and Edenderry give installers clean steel roofs across beef, dairy and arable holdings alike.
Across Tullamore, Birr, Edenderry and Clara, large drystock and dairy yards sit alongside grain stores on flat, unshaded midland sites. Checking roof sheets on older midland haybarns before ordering rails avoids late surprises where light timber purlins or fibre-cement sheeting remain in place.
Tullamore
- Census 2022 homes
- 5,601
- Heating profile
- 36% oil / 13% elec
- Farm solar context
- Good access for telehandler roof work across nearby farms, with ESB feeder checks on longer rural spurs.
Edenderry
- Census 2022 homes
- 2,638
- Heating profile
- 55% oil / 14% elec
- Farm solar context
- Open agricultural hinterland where clean south or east-west steel roofs handle 10 to 30 kWp without shading.
Birr
- Census 2022 homes
- 1,791
- Heating profile
- 49% oil / 17% elec
- Farm solar context
- Commercial sheds around this catchment suit neat 10 to 30 kWp arrays wired back to the main yard fuseboard.
Clara
- Census 2022 homes
- 1,231
- Heating profile
- 41% oil / 3% elec
- Farm solar context
- Market town serving mixed cattle, dairy and arable yards; array size depends on 12 months of farm MPRN bills.
Banagher
- Census 2022 homes
- 720
- Heating profile
- 40% oil / 11% elec
- Farm solar context
- Local yards combine older haysheds and newer portal frames; purlin checks pick the strongest roof slope first.
Price my farm solar
Four quick taps show your full ex-VAT cost and net cost after the 60% TAMS 3 grant before we ask for a phone number.
Dairy farm solar PV, 20 kWp array, with TAMS 3 60% grant, in Offaly: €8,000 to €10,400 net after 60% TAMS (full €20,000 to €26,000 ex-VAT).
How the farm solar figure is worked out
Guide ranges reflect typical Irish ex-VAT supply-and-fit agricultural PV rates (€1,000 to €1,400/kWp on sound steel shed roofs; €1,300 to €1,850/kWp ground-mounted) for panels, mounting rails, inverters, DC/AC cabling and DAFM S.198 commissioning. Net figures deduct the 60% TAMS 3 SCIS grant (paid on the lowest of actual ex-VAT invoice, proposed cost or DAFM reference cost up to €90,000). Optional battery storage (grant-aided up to 50% of solar kWp), ESB NC7 fee (€1,041.81 incl. VAT), purlin strengthening or asbestos roof replacement are priced after an on-farm survey. farmsolarpanels.ie is not DAFM, SEAI or a government body and does not award grants.
Roof mounting, wind uplift and yard siting in Offaly
Getting the roof right first saves both grant delays and repair bills in Offaly. Sound galvanised Z-purlins carry the 15 to 20 kg/m² panel load comfortably, while shaded roofs or pre-2000 fibre-cement sheets point to re-sheeting or a ground frame.
Box-profile & modern steel roofs
€1,000 to €1,400/kWp ex-VAT
Sound box-profile steel cladding over galvanised Z-purlins keeps installation to 2 to 5 working days and avoids structural upgrades. Panels add roughly 15 to 20 kg/m² across the slope.
Peat pockets & ground-mount siting
Site frames on firm mineral ground
Driven piles heave or lean in soft boggy paddocks. A sound steel shed roof avoids groundwork risk and keeps the system in the €1,000 to €1,400/kWp roof band.
East-west vs south roof pitch
Matches dawn & dusk milking peaks
South-facing roofs deliver the highest annual kWh total, while an east-west split spreads generation across a longer working day. Both qualify equally under TAMS 3 S.198.
For mounting detail by sheet type, see mounting solar on corrugated farm sheds. If older roofs need replacement or a paddock frame makes more sense, compare purlin and asbestos rules with ground-mounted arrays.
Worked Offaly kWp prices, batteries and NC6/NC7 fees
20 kWp cattle & dairy roof + 10 kWh battery near Tullamore
€9,600 to €12,800 net
Combines 20 kWp (44 to 50 panels) and 10 kWh battery (inside the 50% TAMS battery cap). Gross €24,000 to €32,000 ex-VAT; expected yield 17,000 to 19,000 kWh/yr.
30 kWp milking parlour or grain store array near Edenderry
€11,200 to €15,600 net
Uses ~150 m² of unshaded steel cladding (66 to 75 panels) at €28,000 to €39,000 ex-VAT before grants, qualifying for up to 15 kWh of TAMS storage.
10 kWp drystock shed NC6 array near Birr
€4,000 to €5,400 net
22 to 25 panels across ~50 m² of sound metal roof. Full price €10,000 to €13,500 ex-VAT before 60% TAMS 3; generates 8,500 to 9,500 kWh/yr. Max TAMS battery: 5 kWh.
No county uplift applies in Offaly: the national €1,000 to €1,400/kWp roof range covers the whole county. Price moves with array scale, battery capacity, cable trench distance (€600 to €2,200), roof condition and whether the yard already has three-phase power.
Grid connection splits into two routes. Small yard arrays stay inside ESB NC6 (free, 20 working days) up to 6 kVA single-phase or 11 kVA three-phase. Dairy, poultry and grain systems running three-phase inverters from 11 kVA to 50 kVA use ESB NC7 (€1,041.81 incl. VAT, 8 to 16 weeks for the Connection Offer). Surplus electricity exported through a smart meter pays 14c to 19.5c/kWh on Clean Export Guarantee tariffs.
Keep upfront bridging cash in mind: the 0% solar VAT rate applies only to houses, so commercial shed PV invoices carry VAT until reclaimed via VAT 3 or Form VAT 58 (over €125, inside 4 years for SEAI Triple E listed hardware). Net ex-VAT spend after TAMS can be written off 100% in Year 1 under ACA instead of over 8 years. Read ACA and VAT 58, CEG payback and cost by kWp.
TAMS 3 SCIS, Offaly County Council planning and SSZs in Offaly
Offaly County Council is the planning authority for Offaly, operating from Tullamore.
Agricultural roof PV carries no area limit under S.I. No. 493 of 2022 once a farm sits outside Ireland's 43 airport and helipad Solar Safeguarding Zones; inside an SSZ the exempt roof cap is 300 m² with 4 weeks' written notice, and ground-mounted arrays stay exempt up to 75 m² and 2.5 m high. Check farm solar planning rules.
- Ring-fenced €90,000 solar budget. Your 60% SCIS grant (up to €54,000, max 62 kWp) does not eat into general slatted-shed TAMS ceilings. Battery storage qualifies only when fitted with PV up to 50% of panel kWp, and work cannot start prior to written agfood.ie approval.
- Written confirmation when in doubt. Standard steel roofs across rural Offaly rarely need planning, whereas paddock arrays over 75 m² do. A €80 Section 5 declaration from Offaly County Council settles boundary questions inside 4 weeks.
- Alternative route for non-TAMS yards. Where a commercial equestrian yard, packhouse or large poultry unit falls outside TAMS 3 eligibility or above 62 kWp, check the SEAI Non-Domestic Microgen Grant (up to 45% on systems up to 1,000 kWp on seai.ie); the two grants cannot be stacked on the same system.
Allow 1 to 2 weeks for the survey and tranche submission, plus 3 to 6 months for DAFM written approval. farmsolarpanels.ie is not DAFM, SEAI or a government body and does not award grants. Read TAMS 3 60% solar grant rules, the mandatory solar survey and installation timelines.
Where Offaly farm solar installers work
Installers serving Offaly cover yards along the M6, N52 and N80 and down rural boreens alike. On survey day they check safe lift standing beside the chosen shed, clean plant-room space for the inverter and battery, and the shortest cable route to the main farm fuseboard.
Installers survey farms around Tullamore, Edenderry, Birr, Clara, Banagher, Ferbane, Daingean and every rural parish in between. One local solar crew working Offaly receives your outline and contacts you directly to arrange an on-farm survey.
- Farm solar panels in Westmeath. Open midland beef and dairy yards suited to east-west roof splits.
- Farm solar panels in Meath. Large beef, dairy and equine roofs with 30 to 50 kWp NC7 capacity.
- Farm solar panels in Kildare. Wide-span tillage stores, stud arenas and level Curragh yards.
- Farm solar panels in Laois. Midland dairy, cattle and cereal sheds on open level yards.
- Farm solar panels in Tipperary. Golden Vale dairy parlours, stud farms and wide cubicle roofs.
- Farm solar panels in Galway. East Galway slatted beef roofs and Connemara coastal NC6 setups.
- Farm solar panels in Roscommon. Rural suckler and sheep yards favouring 10 to 20 kWp NC6 arrays.
Before comparing tenders, read the ten-point farm quote checklist and hot water diverters and load shifting, or browse all 26 counties on counties covered.
Leinster: Carlow · Dublin · Kildare · Kilkenny · Laois · Longford · Louth · Meath · Westmeath · Wexford · Wicklow
Munster: Clare · Cork · Kerry · Limerick · Tipperary · Waterford
Connacht: Galway · Leitrim · Mayo · Roscommon · Sligo
Ulster: Cavan · Donegal · Monaghan
Common Offaly agricultural PV queries
How much do farm solar panels cost in Offaly after the 60% TAMS 3 grant?
Expect €1,000 to €1,400 per kWp ex-VAT on a sound shed roof in Offaly. With 60% TAMS 3 SCIS, net outlay lands around €4,000 to €5,400 for 10 kWp, €8,000 to €10,400 for 20 kWp, €11,200 to €15,600 for 30 kWp and €19,200 to €25,600 for 50 kWp.
Are agricultural solar roofs exempt in Offaly?
Planning queries in Offaly sit with Offaly County Council, based in Tullamore. Under S.I. No. 493 of 2022, agricultural shed roofs have no area limit outside airport or helipad SSZs, and a 300 m² cap inside them. A Section 5 confirmation costs €80 and takes 4 weeks.
Should a mixed cattle and dairy yard in Offaly add a solar battery with TAMS 3?
Only add battery storage if early morning or evening yard demand justifies it. With TAMS 3 covering 60% up to half your panel kWp, a 10 kWh pack drops to €1,600 to €2,400 net on a 20 kWp system.
What inverter size triggers an ESB NC7 application in Offaly?
AC inverter kVA decides it: NC6 is free up to 6 kVA (single-phase) or 11 kVA (three-phase). Going higher up to 50 kVA three-phase moves you onto ESB NC7 at €1,041.81 incl. 23% VAT with a formal Connection Offer required first.
Where in Offaly can I arrange a TAMS 3 solar survey?
Installers cover yards across Tullamore, Edenderry, Birr, Clara, Banagher, Ferbane and every rural townland in Offaly. Your outline goes to one local agricultural solar installer who phones you to arrange an on-farm survey.
All farm solar pages and guides
Farm PV systems
Grants, grid & tax

Price solar PV for your milking parlour
Select your kWp band and county to see net TAMS costs, then a single farm solar installer in your county reviews your parlour MPRN bills.
