Farm solar panels in Longford

Roof-mounted farm solar panels in Longford cost €1,000 to €1,400 per kWp ex-VAT before grant aid. After the 60% TAMS 3 SCIS grant, a 20 kWp shed array lands at €8,000 to €10,400 net (full price €20,000 to €26,000 ex-VAT), generating 17,000 to 19,000 kWh a year.

Agricultural PV from Longford town to Ballymahon: matching kWp and battery size to farm electricity bills, roof purlins and grant rules in Longford.

Free, no obligation. One local installer prices it, not five.

  • €8,000–€10,40020 kWp cattle yard array net after 60% TAMS
  • 60% to €90kTAMS 3 SCIS ceiling (max €54k)
  • 2,515farms in Longford, Census of Agriculture 2020
  • 57%of county homes outside census towns
Aerial view of multi-span agricultural and commercial roofs covered with solar PV panels among rural fields

What Longford farms power with rooftop solar PV

CSO Census of Agriculture 2020 counted 2,515 farms across Longford averaging 28.3 hectares, alongside 16,206 occupied homes in Census 2022 (57% outside census towns). Longford carries 119,830 cattle (25,551 suckler cows and 11,817 dairy cows) and 57,926 sheep. On drystock holdings, winter lighting, scrapers, water pumps and yard workshops suit a 10 kWp roof array with summer CEG export, whereas dairy yards around Longford town and Edgeworthstown use 20 to 30 kWp directly for cooling and washdown.

Cattle and suckler yards around Edgeworthstown, Ballymahon and Granard make up the bulk of farm roofs here, alongside a focused cohort of dairy herds averaging over 70 cows. Older haybarns near cutaway bog often lack purlin strength, making a newer lean-to or ground frame the cleaner option.

Longford town

Census 2022 homes
4,037
Heating profile
53% oil / 19% elec
Farm solar context
Surrounding townlands support both 10 kWp NC6 drystock arrays and larger 20 to 30 kWp milking systems.

Edgeworthstown

Census 2022 homes
744
Heating profile
61% oil / 8% elec
Farm solar context
Service town for surrounding dairy and drystock townlands; check single-phase vs 3-phase supply at the meter early.

Ballymahon

Census 2022 homes
645
Heating profile
45% oil / 25% elec
Farm solar context
Good access for telehandler roof work across nearby farms, with ESB feeder checks on longer rural spurs.

Granard

Census 2022 homes
416
Heating profile
55% oil / 10% elec
Farm solar context
Open agricultural hinterland where clean south or east-west steel roofs handle 10 to 30 kWp without shading.

Drumlish

Census 2022 homes
409
Heating profile
82% oil / 6% elec
Farm solar context
Surrounding parishes combine older haybarns and modern portal sheds; surveyors test purlins before pricing rails.

Price my farm solar

Four quick taps show your full ex-VAT cost and net cost after the 60% TAMS 3 grant before we ask for a phone number.

Beef or suckler shed solar PV, 20 kWp array, with TAMS 3 60% grant, in Longford: €8,000 to €10,400 net after 60% TAMS (full €20,000 to €26,000 ex-VAT).

Step 1 of 5

What type of farm is it?

Pick the closest. The installer reviews your annual bills on site.

How the farm solar figure is worked out

Guide ranges reflect typical Irish ex-VAT supply-and-fit agricultural PV rates (€1,000 to €1,400/kWp on sound steel shed roofs; €1,300 to €1,850/kWp ground-mounted) for panels, mounting rails, inverters, DC/AC cabling and DAFM S.198 commissioning. Net figures deduct the 60% TAMS 3 SCIS grant (paid on the lowest of actual ex-VAT invoice, proposed cost or DAFM reference cost up to €90,000). Optional battery storage (grant-aided up to 50% of solar kWp), ESB NC7 fee (€1,041.81 incl. VAT), purlin strengthening or asbestos roof replacement are priced after an on-farm survey. farmsolarpanels.ie is not DAFM, SEAI or a government body and does not award grants.

Roof pitch, purlins and wind fixings on Longford farms

A solar quote in Longford starts on the shed roof, not in a brochure. Roof pitch, compass aspect, purlin spacing and local wind or salt exposure set both the mounting hardware and how much of the array's output lands during milking or yard work.

Pre-2000 asbestos roof rule

Reroof €45 to €85/m² or ground-mount

Never let anyone clamp rails onto pre-2000 corrugated fibre-cement sheeting. Budget for licensed removal and new steel sheets before fitting PV, or pick a sound adjacent shed or paddock frame.

Purlin & rafter load checks

Engineer cert €350 to €850

Before ordering rails on an older hayshed or lean-to, check purlin depth, span and rust at the bearings. An engineer inspection costs little compared with stripping an overloaded roof later.

Peat pockets & ground-mount siting

Site frames on firm mineral ground

Where a farmyard borders raised or blanket bog, rooftop PV avoids deep ground-mount foundations altogether. If a ground array is needed, probe soil depth first so frames sit on solid bearing.

Read shed purlins and asbestos rules and corrugated shed roof mounting before your survey, or check ground-mounted farm solar if existing roofs face north or carry old fibre-cement sheets.

kWp pricing, TAMS 3 net outlay and ESB rules in Longford

20 kWp mixed cattle & dairy roof array near Longford town

€8,000 to €10,400 net

Uses ~100 m² of unshaded steel cladding (44 to 50 panels) at €20,000 to €26,000 ex-VAT before grants, qualifying for up to 10 kWh of TAMS storage.

10 kWp drystock slatted shed NC6 kit near Edgeworthstown

€4,000 to €5,400 net

Uses ~50 m² of unshaded steel cladding (22 to 25 panels) at €10,000 to €13,500 ex-VAT before grants, qualifying for up to 5 kWh of TAMS storage.

20 kWp ground-mounted array near Ballymahon

€10,000 to €13,600 net

Driven-pile ground array with stock fencing and trenching: €25,000 to €34,000 gross ex-VAT, €10,000 to €13,600 net after 60% TAMS 3. Generates 17,000 to 19,000 kWh/yr.

There is no regional loading for Longford. What separates two tenders for the same kWp around Longford town and Edgeworthstown is whether lifts, the mandatory solar survey (€250 to €550), hot water diverter (€550 to €950) and ESB application are inside the quoted figure.

Watch the ESB threshold when sizing your inverter: NC6 covers up to 6 kVA single-phase and 11 kVA three-phase at zero fee with a 20-working-day notice. Stepping above that up to 50 kVA three-phase (or 17 kVA single-phase) means filing an NC7 application at €1,041.81 incl. VAT and waiting 8 to 16 weeks for the Connection Offer before work starts. Metered export then earns 14c to 19.5c/kWh via CEG.

Private farmhouses qualify for 0% VAT, whereas agricultural shed installations carry standard VAT reclaimed through VAT 3 or Form VAT 58 (minimum €125, within 4 years, SEAI Triple E listed kit). Qualifying equipment also carries a 100% Year 1 Accelerated Capital Allowance on the net ex-VAT balance rather than 8 annual write-downs. Check kWp prices, farm battery storage and VAT 58 and ACA rules.

Grant rules and planning checks for Longford farm PV

Planning in Longford sits with Longford County Council, based in Longford town.

For agricultural sheds, S.I. No. 493 of 2022 exempts the full roof outside Ireland's 43 Solar Safeguarding Zones, sets a 300 m² exempt cap inside an SSZ with 4 weeks' written notice to the council, and limits exempt ground frames to 75 m² and 2.5 m height. Read planning exemptions and SSZs before ordering a large roof or paddock array.

  • TAMS 3 SCIS 60% ceiling & approval order. The Solar Capital Investment Scheme carries its own ring-fenced €90,000 investment ceiling (max €54,000 grant, up to 62 kWp, battery capped at 50% of solar kWp), separate from general farm-building TAMS limits. Complete the mandatory Solar PV Survey first and wait for written approval on agfood.ie before paying a binding deposit or starting work.
  • Written confirmation when in doubt. Standard steel roofs across rural Longford rarely need planning, whereas paddock arrays over 75 m² do. A €80 Section 5 declaration from Longford County Council settles boundary questions inside 4 weeks.
  • Over the TAMS ceiling or ineligible? Commercial agri-businesses or farms exceeding the TAMS 3 ceiling cannot stack grants on the same array, but can review the SEAI Non-Domestic Microgen Grant (up to 45% of eligible costs up to 1,000 kWp, details at seai.ie).

Plan two tranches ahead so your 3 to 6 month approval wait finishes before spring milking peaks, leaving just 2 to 5 working days on site. farmsolarpanels.ie is not DAFM, SEAI or a government body and does not award grants. Full steps sit in our survey guide and the install timeline.

Towns served across Longford and adjoining counties

Panel deliveries and installation vans work out across Longford via the N4 and N5. Give the surveyor a look at yard gates, overhead ESB drops and where a telehandler or edge-protection scaffold can sit along the eaves so milking traffic and feed tractors keep moving during the 2 to 5 day install.

Every parish around Longford town, Edgeworthstown, Ballymahon, Granard, Drumlish, Newtownforbes and Keenagh is served by local agricultural PV crews. Your enquiry goes strictly to one installer working Longford so you deal with a single surveyor from roof check to commissioning.

Useful next reads: how to compare farm solar quotes and equestrian and mixed farm PV. Every county guide is listed on our counties page.

Leinster: Carlow · Dublin · Kildare · Kilkenny · Laois · Louth · Meath · Offaly · Westmeath · Wexford · Wicklow
Munster: Clare · Cork · Kerry · Limerick · Tipperary · Waterford
Connacht: Galway · Leitrim · Mayo · Roscommon · Sligo
Ulster: Cavan · Donegal · Monaghan

Questions Longford farmers ask before applying

What does a farm solar system cost in Longford?

Expect €1,000 to €1,400 per kWp ex-VAT on a sound shed roof in Longford. With 60% TAMS 3 SCIS, net outlay lands around €4,000 to €5,400 for 10 kWp, €8,000 to €10,400 for 20 kWp, €11,200 to €15,600 for 30 kWp and €19,200 to €25,600 for 50 kWp.

Are agricultural solar roofs exempt in Longford?

Outside Ireland's 43 Solar Safeguarding Zones, S.I. No. 493 of 2022 exempts the entire roof of an agricultural shed with no size cap. Inside an SSZ, exempt roof area caps at 300 m² with 4 weeks' written notice to Longford County Council. Ground frames stay exempt up to 75 m² and 2.5 m high.

What size solar array makes sense on a beef or suckler shed in Longford?

Unless you run a milking parlour or heavy workshop plant, 10 kWp (€4,000 to €5,400 net after TAMS 3) is the practical starting point for a Longford beef shed, avoiding NC7 fees while earning 14c to 19.5c/kWh on summer export.

When does the €1,041.81 ESB NC7 fee apply in Longford?

Inverters up to 6 kVA single-phase or 11 kVA three-phase qualify for free ESB NC6 (20 working days). Larger arrays up to 17 kVA single-phase or 50 kVA three-phase require an ESB NC7 application (€1,041.81 incl. VAT) and a written Connection Offer before fitting.

Will an installer survey a rural yard outside Longford town or Ballymahon?

Every rural parish around Longford town, Edgeworthstown, Ballymahon, Granard and Drumlish is served. Passing your outline through the planner routes it to one solar company working Longford for a written S.198 price.

All farm solar pages and guides

Long pitched-roof dairy cattle shed covered in rooftop solar PV panels under an overcast sky

Price solar PV for your milking parlour

Select your kWp band and county to see net TAMS costs, then a single farm solar installer in your county reviews your parlour MPRN bills.